This report is submitted for informational purposes to the builder on proposed (new) construction cases when soil treatment for prevention of subterraneantermite infestation is specified by the builder, architect, or required by the lender, architect, FHA, or VA.
Full Answer
What forms do I need for a 2581 soil treatment record?
(Updated Form – Exp. 09/30/2022) There are two forms required (1) 2580 Builder Guarantee (completed by builder) and (2) 2581 Soil Treatment Record (completed by pest control company) see product 2581 NPMA – 99b. 4-part, all White Carbonless Copies.
What are the requirements for using soil treatment on concrete?
If soil treatment is used, forms and traps must be plastic or metal. R318.1.4 If soil treatment is used, vapor barrier must be installed. R318.1.5 If soil treatment is used, concrete over pour must be removed. R318.1.6 If soil treatment is used, applications must also be made within 1 foot of the foundation under adjoining slabs. R318.1.7
When to install soil treatment under adjoining slabs?
If soil treatment is used, applications must also be made within 1 foot of the foundation under adjoining slabs. R318.1.7 Signed contract ensuring installation for five-year period from issuance of Certificate of Occupancy provided to building official PRIOR to pouring of slab. System must be installed prior to final building approval.
Why perform soil testing for new homes?
There’s a lot to consider. One overlooked part of the planning phase is a soil test. The state of your soil can play a surprisingly important role in the house building process, either in the initial stages or, worse, further along the timeline, perhaps even years after your home has been built. Why Perform Soil Testing for New Homes?
What is soil treatment in construction?
To soil treat a site of new construction, generally, a trench is dug adjacent to both sides of the foundation walls, and the soil is soaked with pesticide. The soil is then replaced into the trench, carefully mixing it with the diluted pesticide.
What is soil treatment guarantee?
The builder hereby guarantees that, if subterranean termite infestation should occur within one year from the date of closing, the builder will ensure that a licensed or otherwise State authorized pest control company (where required by State law) or other qualified licensed pest control company will further treat as ...
What is a 99B form?
The HUD NPMA-99B form is a termite-related document. It is submitted for the informational purpose to the builder on new (proposed) construction when soil treatment for the prevention of subterranean termite infestation is specified by the builder, architect or required by the lender, FHA, or VA.
What is HUD Npma 99 a?
NPMA-99-A. Subterranean Termite Soil Treatment Builder's Guarantee (10/2019)
What is form NPCA 99A?
The HUD NPMA 99A form is submitted for proposed (new) construction cases when prevention of subterranean termite infestation is specified by the builder or required by the lender, the architect, FHA, or VA.
What is a Npma 33?
The NPMA-33 inspection is one of the most important inspections required when purchasing or refinancing a home. This is a wood-destroying insect inspection, also known as a termite inspection, and one that may determine whether or not you can obtain a loan to buy a home.
Is termite treatment required for new construction in Virginia?
In Virginia, codes and compliance requires new construction projects to have a proper termite pretreatment certifications. "Terrance was amazing. He's so professional and personable. There is a reason I have stayed with National Exterminating so long and it is because of Terrance." Lisa V.
What is preliminary soil report?
Per the CBC, preliminary soils reports are mandatory for all subdivisions creating 5 or more parcels, 5 or more condominiums, community apartment projects with 5 or more parcels, and conversions of dwellings to stock cooperatives with 5 or more units. If a preliminary report identifies soil issues which could cause structural damage to the building, the CBC mandates a full geotechnical investigation.
What is the purpose of soils report?
One aim of a soils report is to find the elevation of the water table. If it’s high, the engineer will have to address the potential leaks and flooding in the below-grade floors of a building. The design may include groundwater control systems and/or waterproofing to mitigate the effects of a high water table. Damp proofing may be an acceptable moisture barrier where there is no hydrostatic pressure.
Why do you need a Soil Report?
Safety is a soils report’s primary aim. It’s achieved by finding dangerous soil conditions and recommending design criteria that address them. Besides ensuring safety, a soils report may help save money on construction costs, as it will allow your structural engineers to design a foundation based on the report’s criteria, rather than erring on the side of caution and over-designing.
What is compacted fill?
Compacted fill is not the only option for replacing soils with poor bearing capacity. CLSM, also known as flowable fill, is a mixture of Portland cement, water and fine aggregate or fly ash, and is an alternative to compacted fill. Its self-consolidating and self-leveling properties make CLSM popular among contractors. Before it can be used to support foundations, however, a soils report with relevant details must be issued.
Why does soil swell when saturated?
The resulting changes in the soil’s volume cause the building built on it to lift and settle, leading to cracks in the foundation and other structural damage.
Can civil engineers prepare soils reports?
In California, only registered civil engineers may prepare soils reports. These professionals determine the scope of the investigation, the equipment required, and the need for additional studies. A qualified representative of the engineer must be present on site during all exploration activities.
Do you need a soil report for a building?
As well, local building officials may waive the need for a soils report if enough data from adjacent sites is available. Conversely, they may use discretion to request a soils report where none required by the code.
Why Perform Soil Testing for New Homes?
Soil testing for new homes is needed in order to determine the composition of the soil and if it can properly support a foundation. It’s usually also a necessary part of getting a building permit.
When to do soil testing?
Soil testing is typically performed after the foundation has been dug but before footings have been placed. However, you can also request soil testing before buying land and have it put in writing that your offer is contingent on the property passing the soil test. Soil testing can also be ongoing during the construction process.
Who Performs Soil Testing?
Soil engineers perform soil testing. They can be hired privately or through the architect or contractor who will be planning and building your new home. These individuals are also known as geotechnical engineers, and they must have met several criteria before working as a soil engineer. Geotechnical engineers have degrees in civil engineering. They must also be licensed in their particular state and have passed the National Council of Examiners for Engineering and Surveying (NCEES) Fundamentals of Engineering exam.
What Is the Job of a Soil Engineer?
Soil engineers bore holes in the soil and take samples. These samples are then tested in order to determine the suitability of the soil. Soil engineers can test the soil before construction, during the construction process and after construction is complete to ensure ongoing compatibility. They’ll even perform soil testing on sites with existing buildings that have experienced foundation problems or may experience problems in the future.
What Are Soil Engineers Testing For?
Soil engineers test the composition of the soil in order to determine if it is strong soil or weak soil.
What Should I Expect if I Choose to Test the Soil Prior to Buying Land?
If you want to test the soil of your new potential property prior to buying the land, you need to make it known when you place your bid for your new home site. In this instance, you’d make an offer on the land and have it put into the purchase agreement that you will be having the soil tested by a licensed soil engineer. This means that you can decline to purchase the property based on the test results without any penalties or repercussions.
How deep should a soil engineer drill holes?
In some instances, the soil engineer may have to bore holes that are between seven and ten feet below the surface in order to test the water table and potentially find bedrock or harder soils.
The Facts
Arrow Pest Control offers Soil Treatment Records (99B) and Wood Destroying Insect Reports (Termite Certificates) to our current customers, non-customers, builders, and the real estate industry.
Arrow WDIR & Termite Certificate Pricing
A WDIR can only be issued for the act of sale or refinance of a home or property.
TURN OFF AUTOMATIC UPDATES ON YOUR DEVICES IF YOU ARE NOT USING VERSION 18 OR GREATER as your data will not be accessible without an update!
For those buying a new Mac - Monterey and the M1 chip are fully supported. Windows 11 is also fully supported.
If using any version prior to 18 fill out a technical support request so a time can be scheduled to update your files
Technical Support requests send an email of the information that has been received, if you do not receive a verification email concerning your support request, then please call and leave a message on our voicemail to get service. Contact is usually made within 4 hours during normal business hours. THANK YOU!