Treatment FAQ

how old is the collins park water treatment

by Markus Lynch Published 3 years ago Updated 2 years ago
image

The Collins Park Water Treatment Plant began its operations in 1941, pumping 80 gallons per day.Mar 3, 2020

Objectives

Produce the best quality potable drinking water at the lowest cost for 500,000 people in the greater Toledo Metropolitan area by purifying and transporting treated surface water to sustain industry and enhance the lives of our residents.

Laboratory

Within the Laboratory section is the microbiology, water quality, and research laboratories. The three laboratories are certified by the Ohio Environmental Protection Agency to collect water samples and monitor results. Our team is make up of highly trained chemists, microbiologists, and sample collectors.

Water Quality

The water quality section ensures that the water being distributed meets or exceeds the criteria of the Safe Drinking Water Act. Compliance reports are sent to the Ohio Environmental Protection Agency monthly with the analytical results for regulated contaminants.

image
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 1 2 3 4 5 6 7 8 9