What does Robeson County solid waste do?
Robeson County Solid Waste currently employs 25 full-time staff and 79 part-time staff. The Department includes the following areas: landfill, 20 collection sites, recycling, and methane to energy generator program, environmental control as well a full-time garage.
Who is responsible for issuing wastewater permits in North Carolina?
Lumberton Wastewater Treatment Plant, Robeson County, North Carolina. Lumberton Wastewater Treatment Plant is a cultural feature (locale) in Robeson County. The primary coordinates for Lumberton Wastewater Treatment Plant places it within the NC 28358 ZIP Code delivery area. Maps, Driving Directions & Local Area Information
What kind of wastewater is sent to the North Carolina NPDES program?
Pembroke Wastewater Treatment Plant, Robeson County, North Carolina. Pembroke Wastewater Treatment Plant is a cultural feature (locale) in Robeson County. The primary coordinates for Pembroke Wastewater Treatment Plant places it within the NC 28372 ZIP Code delivery area. Maps, Driving Directions & Local Area Information
What is involved in the wastewater treatment process?
All wastewater discharges to surface waters in the State of North Carolina must receive a permit to control water pollution. The Clean Water Act of 1972 initiated strict control of wastewater discharges with the responsibility of enforcement given to the Environmental Protection Agency (EPA). The EPA then created the National Pollutant Discharge Elimination System (NPDES) to …
What is the process of wastewater treatment?
The Wastewater Treatment ProcessStage One — Bar Screening. ... Stage Two — Screening. ... Stage Three — Primary Clarifier. ... Stage Four — Aeration. ... Stage Five — Secondary Clarifier. ... Stage Six — Chlorination (Disinfection) ... Stage Seven — Water Analysis & Testing. ... Stage Eight — Effluent Disposal.Mar 5, 2021
What are the 6 steps of wastewater treatment?
Treatment StepsStep 1: Screening and Pumping. ... Step 2: Grit Removal. ... Step 3: Primary Settling. ... Step 4: Aeration / Activated Sludge. ... Step 5: Secondary Settling. ... Step 6: Filtration. ... Step 7: Disinfection. ... Step 8: Oxygen Uptake.
What is wastewater collection and treatment?
Wastewater Collection & Treatment collects water from toilets, sinks and drains, treats it, and returns it to the river.
How a wastewater treatment facility works?
The wastewater enters an aeration tank, where it is mixed with sludge. Air is then pumped into the aeration tank to facilitate the growth of bacteria and other small organisms within the sludge. The bacteria and other microorganisms break down the organic matter in the water into harmless byproducts.Oct 8, 2018
Which is the first treatment process for wastewater treatment?
Gravity separation of solids is the primary treatment of sewage, where the unit process is called "primary settling tanks" or "primary sedimentation tanks." It is also widely used for the treatment of other types of wastewater.
What happens to poop at the water treatment plant?
The wastewater flows through bar screens to remove trash and debris, then slowly moves through a grit tank where sand and heavy particles settle and are removed.
What are the advantages and disadvantages of wastewater treatment?
The advantages and disadvantages of wastewater treatment systemsCompact (less than 10m2 of floor space for a complete installation)As efficient as a conventional sewer.Reliable.Can be installed on difficult and compact sites.Cost effective (taking into account installation, running costs and maintenance)
What is preliminary treatment of wastewater?
Preliminary treatment seeks to remove grit, rags and solids that float which may harm the operation of the rest of the plant. Bar racks or mechanical screens remove paper, rags and other large solids. Sand and grit are removed by gravity settling in a grit chamber.
What methods are used in primary treatment of wastewater?
There are three basic biological treatment methods: the trickling filter, the activated sludge process, and the oxidation pond. A fourth, less common method is the rotating biological contacter.
What are the 3 stages of wastewater treatment?
There are three main stages of the wastewater treatment process, aptly known as primary, secondary and tertiary water treatment.Dec 6, 2018
What are the benefits of the waste treatment process?
Here are the five major benefits of wastewater treatment.Provides clean, safe water processed. To many, it is unknown to them that wastewater can be turned into reusable water. ... Saving you money. ... Beneficial to the environment. ... Saving water. ... A way to minimise waste.
What are the 4 steps of water treatment?
4 Steps of Community Water TreatmentCoagulation and Flocculation. ... Sedimentation. ... Filtration. ... Disinfection.
Lumberton Wastewater Treatment Plant, Robeson County, North Carolina
Lumberton Wastewater Treatment Plant is a cultural feature (locale) in Robeson County. The primary coordinates for Lumberton Wastewater Treatment Plant places it within the NC 28358 ZIP Code delivery area.
Use HTL Address Research for a North Carolina Address and get..
Review maps and data for the neighborhood, city, county, ZIP Code, and school zone. July 1, 2021, data includes home values, household income, percentage of homes owned, rented or vacant, etc.
Important Links
e-DMR: EPA’s Electronic Reporting Rule and how it may affect permit holders.
NPDES Permitting Guidance
Dissolved Metal to Total Metal Limit Calculators: Includes median HUC hardness values, user guide and calculators to assist permittees in understanding how the proposed Surface Water Standards (dissolved metals) impact permit limits.
How long does a NPDES permit last in North Carolina?
Therefore, NPDES permits in North Carolina are usually renewed (and expire) on a 5-year basinwide schedule. If the facility submits a timely renewal application, the facility may continue to operate under its existing permit until a new permit is issued, even after the permit's expiration date. 4.
What to do if your facility is not capable of discharging?
If your facility is not capable of discharging, you should rescind the permit. Once you rescind the permit, you will no longer be able to discharge wastewater. To request a rescission, simply send a letter to the NPDES Unit containing the facility's name, permit number, and reason for the request. Back to top.
How long does it take to renew a permit?
The permittee should also request any desired changes to the permit with the permit renewal applicaiton. Permits are generally drafted within 30-60 days of expiration and placed at public notice. Once the comment period is over, the permit can be finalized. Generally, renewal of NPDES permits takes about six months.
What is EAA in NC?
In some cases, the North Carolina Environmental Policy Act (SEPA) may apply, and a SEPA Environmental Assessment (EA) or Environmental Impact Statement (EIS) must be prepared to study all possible negative effects on the environment.
What is a special order by consent?
A Special Order by Consent (SOC) is an agreement that a permit holder enters into with the Environmental Management Commission in order to achieve some stipulated actions designed to reduce, eliminate, or prevent water quality degradation.
What is an injunctive relief order?
What is injunctive relief? Injunctive relief is a court order to discontinue or prevent an exisitng or potential violation. This court order is often used if a responsible party demonstrates consistent non-compliance with regulations or if an imminent danger exists to health or the environment. 7.
What is civil penalty?
Civil penalties are fines assessed against a responsible party for violation (s) of environmental regulations. The assessment of a penalty is based on the specifics of each civil penalty case. The law requires consideration of specific assessment factors by the assessor for each case. 5.
What to do if you no longer need a discharge permit?
In order to rescind an NPDES permit the facility owner (or authorized representative) should send a letter including the permit number, name and address of the facility, and reason for the rescission request to the NPDES Permitting and Compliance Program.
What are the major modifications to NPDES permits?
Major modifications to NPDES permits include, but are not limited to: changes to compliance schedules, increases in flow or pollutant loads, changes to permit limits, corrections of technical mistakes, or material and substantial alterations to the permitted facility or on-site activity.
How long are NPDES permits valid?
NPDES permits are valid for 5 years and are renewed on a basinwide cycle, all the permits in a basin are renewed at the same time. Renewal of an existing NPDES permit must be requested and accompanied by a complete application 180 days prior to expiration of the existing permit. This allows sufficient time for initial review, permit development, internal review, and the public comment period. If the new permit is not issued before the existing permit expiration date, the old permit remains valid until the issuance of the new permit.
What is a NPDES permit?
Any person that discharges or proposes to discharge waste to the surface waters of the state must obtain a NPDES permit prior to the initiation of such discharge. NPDES permits are distinguished between individual and general. General permits are issued for a given state-wide activity such as the discharge of wastewaters associated with sand dredging or non-contact cooling. Individual permits are permits developed and issued on a case-by-case basis for activities not covered by general permits. These permits can be readily identified by their prefix. Individual NPDES permits have the prefix NC while general NPDES permits have the prefix NCG.
What happens if a permit renewal is not complete?
For permit renewals if the application is not complete the permit writer will contact the permittee to request the missing information. For new permits or permit expansions, if the application does not contain all the required information and forms it will be returned to the applicant.
What is an individual permit?
Individual permits are permits developed and issued on a case-by-case basis for activities not covered by general permits. These permits can be readily identified by their prefix. Individual NPDES permits have the prefix NC while general NPDES permits have the prefix NCG.
What is a minor permit modification?
Minor permit modifications are defined in 40 CFR 122.63 (e.g. change in monitoring frequency, name/ownership change) and are generally processed in a shorter timeframe. There is no fee for minor permit modifications.
What to do if your home has a sewer clean out?
If your home has a sewer clean out, remove the cap for a visual inspection. If water is visible, overflowing or standing, you definitely have a problem. It will be necessary to determine if it is a simple drain clog, your yard line or the City's main line that is the problem. Call Us First.
What is the phone number for sanitary sewer?
If you experience sanitary sewer problems, call us at (432) 523-4820 . After-hours, contact (432) 266-1550 or (432) 556-2870 . We can check if there is a problem in the City's main sewer line that may be causing your problem. By calling us first, you may save yourself a plumbing bill.
What is a stoppage crew?
Stoppage Crews. Upon being notified of a problem, a city crew will typically take a sewer machine to the dispatched location. The crew will then visually inspect and run the sewer machine to clean the City's main line, which could remedy the problem.
How long does the Reclamation Plant operate?
Operation. The Reclamation Plant operates 24 hours a day, 7 days a week, and has operators on call after 5:00 p.m. and on weekends.
What is a TCEQ certification?
Wastewater operators are required to hold treatment certifications from the Texas Commission on Environmental Quality (TCEQ) and maintain high standards for operation and maintenance. If you suspect a sewer drain clog in your main yard line, stop any usage of your home's plumbing until the clog is removed!
Do wastewater systems have odors?
STUDIES SHOW THEY DO NOT DISSOLVE AND WILL CLOG SEWER SYSTEMS. Odor Control. Odors occur is a natural part of the treatment of wastewater. By design, odors are usually contained within the plant site; however, due to a variety of operating and weather conditions, odors will occasionally drift away from the facility.