Treatment FAQ

how is new equipment or tankage constructed and put into service in an operating treatment plant?

by Mr. Giovanni Ritchie Published 2 years ago Updated 2 years ago

What is a sewage treatment plant on a ship?

A sewage treatment plant on ship consists of a screen filter, primary chamber, aeration chamber, demisters, blowers, settlement and chlorination chamber. Together they treat and discharge waste to comply with Marpol regulation IV.

How is the waste water stored in a sewage treatment plant?

The raw waste water originating from toilet, wash basins and bathrooms; with a concentration of 0.1% solid waste by weight is stored in the primary chamber. The sewage is fed into the chamber with special macerator pumps that reduce human waste to slurry using blending and grinding techniques.

What is the difference between sewage treatment and sewage treatment plant?

While the system used to perform sewage treatment is called sewage treatment plant. A sewage treatment plant on ship consists of a screen filter, primary chamber, aeration chamber, demisters, blowers, settlement and chlorination chamber.

What is the purpose of a settling tank?

The sewage after bacterial action is then passed on to the next chamber called settling tank. It consists of a set of separating channels with slop slides. The heavier sludge and other sewage particle is separated of the light water; which is then discharged overboard.

What is the process of SBR?

The operation of an SBR is based on the fill-and- draw principle, which consists of the following five basic steps: Idle, Fill, React, Settle, and Draw. More than one operating strategy is possible during most of these steps.

How do you create a WWTP?

The overall design of the wastewater treatment plant consists of 4 stages: i) Primary treatment which consists of screening, grit removal and sedimentation ii) Secondary treatment consists of a bioreactor iii) Tertiary treatment consists of nitrogen removal, adsorption and pH control.

How do you start activated sludge process?

An activated sludge plant can be started up at the design mixed liquor volatile sus- pended solids concentration, or with sufficient sludge for lower or higher initial suspended solids. Aeration basins can be started up partially or completely filled.

Which types of processes are used in a wastewater treatment plant?

Biological processes such as anaerobic wastewater treatment, biochemical oxidation or sludge digestion. Chemical processes such as neutralisation, disinfection, flocculation and precipitation. Membrane processes such as filtration, osmosis and nanofiltration.

What are the factors that were considered in designing the wastewater treatment plant?

Major factors to be considered are: (1) type of the water source, (2) desired finished water quality, (3) skill of facility operators, and (4) the relative size of available funds.

What are the factors need to be considered while designing and operating an industrial water treatment facility?

This paper contains some examples where most of these concerns existed, but were addressed to the satisfaction of concerned neighbors.Choosing a Plant Name. ... Designing the Layout. ... Selecting the Appropriate Wastewater Treatment Processes. ... Controlling & Mitigating Odors. ... Public Relations for Wastewater Treatment Plants.More items...•

How does an activated sludge plant work?

How Does the Activated Sludge Process Work? The activated sludge process in the treatment of wastewater involves blowing oxygen or air into raw, unsettled sewage. This process smashes the solids. The sewage is bubbled, and sewage liquor is discharged into an activated sludge chamber.

What is activated sludge treatment process?

The activated sludge process is a means of treating both municipal and industrial wastewater. The activated sludge process is a multi-chamber reactor unit that uses highly concentrated microorganisms to degrade organics and remove nutrients from wastewater, producing quality effluent.

What factors are required for activated sludge plant?

Such factors include:The type of reactor (configuration).The aeration.The Food to Microorganisms ratio – F/M ratio.pH and temperature of the water.Nutrients in the water.The detention time.

How can wastewater treatment plants be improved?

The five steps outlined below can help water treatment plants to achieve better water efficiency and realize potential cost savings by reducing water waste.Conduct a self-assessment. ... Evaluate technology. ... Perform a pump audit. ... Install smart technology. ... Review the data.

What are the 4 stages of wastewater treatment?

4-Step Wastewater Sludge Treatment ProcessStep 1 – Sludge Thickening. The first step in the sewage sludge treatment plan is called thickening. ... Step 2 – Sludge Digestion. After amassing all the solids from the sewage sludge begins the sludge digestion process. ... Step 3 – Dewatering. ... Step 4 – Disposal.

What are the 3 stages of wastewater treatment?

There are three main stages of the wastewater treatment process, aptly known as primary, secondary and tertiary water treatment. In some applications, more advanced treatment is required, known as quaternary water treatment.

GWT Treatment Solutions Can Assist A Wastewater Treatment Plant to Conquer 4 Critical Issues

Clean water is a necessary resource for life, business, and the environment in which we live throughout the world.

1. Personnel

Treatment Operators in wastewater treatment facilities must be adequately trained and certified for these positions. These individuals are kept on alert throughout the day and night. They are responsible for coordinating and managing everything from valves to pipe leaks as well as instrumentation and electrical systems.

2. Energy Consumption

Energy consumption is one of the biggest expenses in operating a wastewater treatment plant for an industrial or water utility client. The generation and subsequent treatment of wastewater is estimated to deplete around 3% of a modern nation’s electrical power supply, or on average an anticipated 61 tWh (terawatt hours) of power each year.

3. Sludge Generation

Sludge is the residual solid particles generated during the phases of the wastewater treatment process. This process includes mechanical, biological and chemical treatment.

4. Footprint

Conventional activated sludge treatment has many issues – one of the largest is its land footprint. Activated sludge wastewater treatment plants are more costly to construct due to the extensive civil works construction involved.

Overview

Both operation and maintenance is important for all industrial treatment plants including the Effluent Treatment Plant. ETP is a plant constructed to treat industrial wastewater to some extent. This is to prevent the pollution load from crossing the legislative standards.

How to achieve the objective?

Ensure that you have a manual for ETP maintenance and operation by the manufacturer. Moreover, the operation and maintenance manual of the ETP should contain:

Maintenance of ETP

Following the manual: We follow the operational and maintenance manual of the ETP manufacturer. So that the specific ETP model can be maintained accordingly. This manual allows our experts to inspect various readings, output measures, chemical usage, etc. The manual must fit the ETP installation on site.

Different Type of MAintenance

Routine Maintenance: The day-to-day management of ETP is essential. Monitoring of the inlet and outlet conditions of waste and treated effluent have a crucial function in the case of effluent treatment plants.

What we offer?

Well-trained, skilled, and experienced operator with a supervisor who solves the problems smoothly during the maintenance of ETP.

Bottom Line

For several reasons, the efficient management and maintenance of a wastewater treatment plant are important. It is essential to make sure that one section’s improper functioning leads to the failure of the entire treatment process. For several reasons, it is vital to efficiently operate and maintain a wastewater treatment plant.

What is the purpose of operation and maintenance?

Operation and maintenance of a water supply system refers to all the activities needed to run the system continuously to provide the necessary service . The two words are very frequently used together and the abbreviation ‘O&M’ is widely used. The overall aim of operation and maintenance is to ensure an efficient, effective and sustainable system (Castro et al., 2009). ‘Efficient’means being able to accomplish something with the least waste of time, effort and resources; ‘effective’ means being successful in producing the intended result; and ‘sustainable’ means able to be maintained at the best level over time – in this case, the supply of water.

What are the two types of maintenance?

There are two types of maintenance: Corrective or breakdown maintenance: this is carried out when components fail and stop working. Breakdown is common in many utilities in Ethiopia and occurs as a result of poor preventive maintenance (explained next).

What is maintenance in engineering?

Maintenance is the planned technical activity, or an activity taken in response to a breakdown, to keep a system operating. The former is referred to as ‘preventive maintenance’ and the latter as ‘breakdown maintenance’.

What is maintenance plan?

The plan will outline the maintenance activities, their timing or frequency and the information needed for the record for each asset. It will also take into account the current condition of the asset, and its criticality (degree of importance) for the water supply system. Based on the plan, activities such as inspections, parts replacement and preventive maintenance will take place.

What department manages the water supply?

The Finance Department manages the water utility’s budget and makes sure that all financial transactions are recorded, and that revenue is collected for water supplied. Finally, if relevant, the Sewerage Department looks after the sewer network and sewage treatment.

What is the planning department?

The Planning Department plans for the growth in services provided. The Commercial and Customer Care Department handles queries and complaints from commercial and domestic customers. The Engineering Department is responsible for major engineering works, such as refurbishment or expansion of facilities.

What is a town water board?

The Town Water Board is a committee made up of individuals who are specialists in water treatment and supply, representatives of other sector offices such as Health and Education, and other stakeholders (in this context, representatives of people who would be affected by the water utility’s actions).

How many crews are required to have a sewage treatment plant?

The law requires all ships and water vessels above 4000 Gross tonnage dead weight or carrying more than 15 crew / personal in international waters is required to have dedicated sewage treatment plant or sludge tank to hold sewage for appropriate time.

What is sewage treatment plant?

A sewage treatment plant is designed to treat and process raw sewage over different steps involving breaking, filtering, settling, controlled aerobic decomposition and chemical treatment. One of the most common things that come in our mind regarding human waste; is to dump it to the sewers and let the government take care of it.

What happens when you discharge sewage in open water?

In the absence of sewage treatment plant when we discharge the waste in open water; the waste starts to attract aerobic bacteria and decompose on its own. Not just it suck up the necessary oxygen from the water but also lead to widespread risks of health epidemic if discharged near port.

How long does it take to remove the smell of chlorine from a water tank?

This is done by adding a 5 % solution of chlorine to kill of bacteria within a period of 30 minutes. Further chemical treatment is done to remove the smell and get rid of the pale colour.

What is the process used to break down sewage into small parts?

The process used to systematically break the sewage into small parts; using biological and chemical method is known as sewage treatment.

Why use an air driven ejector pump?

To reduce the need to add fresh set of bacteria and increase plant efficiency; many new designs came with air driven ejector pump. They pumps 1/4th of the sludge back to aeration chamber for further treatment and growth of bacteria in the fresh lot of sewage.

What is chemical sewage treatment?

The preliminary chamber is equipped with coarse and fine mesh of screen as filters to remove large solid particles from getting into the system. In many designs it stay set at the top of the primary chamber with flow measurement device recording and filtering waste water inlet at the same time.

Overview

How to Achieve The Objective?

Guidelines For ETP’s Operation

Maintenance of ETP

What’s Involved in The Maintenance of The Effluent Treatment Plant?

  • There are many reasons to depend on the amount of work you need to maintain the Effluent Treatment Plant: 1. Scale in the plant. 2. Complexity of design. 3. Nature of the wastewater coming in. 4. Automation degree in design. 5. Quality sampling and also analysis criteria for effluent. 6. Status of the plant when work is commenced. Preventative main...
See more on blog.jateentrading.com

Different Type of Maintenance

What We offer?

Bottom Line

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 1 2 3 4 5 6 7 8 9